Kazakhstan plans to export 1.5 million tons of oil through the Baku-Tbilisi-Ceyhan (BTC) pipeline in 2024, the Ministry of Energy said in a statement, Report informs.
According to the information, this year the production of oil and gas condensate in Kazakhstan is planned to be 90.3 million tons. The export is expected to reach 70.8 million tons, with 56.7 million tons to be transported through the Caspian Pipeline Consortium (CPC).